This page highlights current and upcoming Town projects that support our community’s growth, infrastructure, and quality of life. Check back for updates, timelines, and key information as projects progress.

 

Project Overview

The Youth Arena Feasibility Study, phase 1 has been completed. Nustadia Recreation provided a number of options for consideration to Council, and Council supported, in principle, exploring Option 1B.  Staff have been provided direction to explore potential partnerships and funding opportunities for this regional recreation facility. 

Supporting Documents

Smiths Falls Youth Arena Feasibility Study - Draft Final

Public Engagement

  • A community open house took place at the Smiths Falls Memorial Community Centre on January 29, 2025.
  • A feasibility study survey was available in February 2025.

Estimated Completion

Project Contact

Stephanie Clark
Director of Community Service
Phone: 613-283-4124  Ext. 6101
Email: sclark@smithsfalls.ca 

Project Overview

The Town of Smiths Falls is undertaking a comprehensive redesign of Lower Reach Park to enhance its recreational offerings and better serve the community. This initiative is part of a broader effort to modernize parks and recreation facilities across the town.

Supporting Documents

 

Public Engagement

  • A public engagement session was held at the Smiths Falls Community Centre on November 4, 2024. 
  • A public engagement session was held at the Smiths Falls Community Centre on February 19, 2025.
  • A public survey was available in February 2025.

Estimated Completion

Fotenn Consultants provided us with a conceptual master plan for Lower Reach Park. Over the next ten years, subject to annual budget approval, staff will work to revitalize our community’s premiere park and play space. The first step is to build a new parking lot, allowing revitalization along the shoreline; construction will commence in 2026.

Project Contact

Stephanie Clark
Director of Community Service
Phone: 613-283-4124  Ext. 6101
Email: sclark@smithsfalls.ca 

Project Overview

A Heritage Conservation District is a planning process used in Ontario to identify and evaluate areas with cultural heritage value or interest. The study looks at a neighbourhood’s historic buildings, streetscapes, and overall character to determine whether it should be designated as a Heritage Conservation District under the Ontario Heritage Act. The goal is to understand what makes the area special and how those features can be conserved over time. The Town is undertaking this study to help guide future growth and change, protect valued heritage assets, and ensure that development respects the community’s historic character while allowing it to evolve.

Supporting Documents

Notice of Passing of Heritage Conservation District Designation By-law

By-law No. 10666-2026 - By-law Designating the Downtown Smiths Falls Heritage Conservation District and Approving the Finalized Plan 

Draft Downtown Smiths Falls Heritage Conservation District Plan

Smiths Falls Downtown Area Heritage Conservation District Study

Public Engagement

  • An open house was held at the Town Hall Welcome Centre on November 7, 2024.
  • An open house was held at the Town Hall Welcome Centre on March 6, 2025.
  • A survey was available to the public in September 2025.
  • An open house was held in the Council Chambers on September 18, 2025.
  • A public meeting was held in the Council Chambers on December 15, 2025.

Estimated Completion Date

April 2026

Project Contact

Karl Grenke
Manager of Development Services
613-283-4124 ext. 1116
kgrenke@smithsfalls.ca

Project Overview

The Town of Smiths Falls is currently engaged in creating a New Official Plan while simultaneously creating a new Transportation Master Plan (TMP). Dillon Consulting has been retained to work with the Town and Stakeholders to define how the Town will grow and develop in the next 25 years and determine the best investments the Town can make in transportation infrastructure with a continued focus on sustainable transportation options.

Supporting Documents

Upcoming Public Engagement

  • Statutory Public Meeting in Council Chambers, Town Hall on August 25th, 5:00 pm

Estimated Completion Date

Spring 2027

Project Contact

Karl Grenke, MCIP, RPP
Senior Planner
Phone: 613-283-4124 Ext. 1116
Email: kgrenke@smithsfalls.ca

Project Overview

The Town of Smiths Falls is undertaking Phase 1 of the Trunk Watermain and Sewer Separation Project to support the long-term servicing needs of the community and improve municipal infrastructure.

This project; being the first of three phases, includes sanitary sewer repairs on Rideau Avenue South, the construction of a new trunk watermain connecting the elevated water storage tank located at 12 Air Care Drive to the existing trunk watermain on Rideau Avenue South, the construction of a distribution watermain to service properties on Lorne Street, the construction of a multi-use pathway connecting Air Care Drive to Lorne Street, and the full reconstruction of Lorne Street in Smiths Falls.

The project is intended to improve the reliability and performance of the Town’s water and wastewater infrastructure while supporting future growth, active transportation, and long-term service delivery needs.

Supporting Documents

None.

Public Engagement

Project updates and notices related to construction activities, traffic impacts, and potential service disruptions will be provided as required throughout the project.

Residents with questions or comments regarding the project are encouraged to contact the Town using the information provided below.

Estimated Completion

Construction of the Trunk Watermain and Sewer Separation Phas1 Project is anticipated to be completed by the end of 2026.

Project timelines are subject to change based on construction progress, weather conditions, material availability, approvals, and other project-related factors.

Project Contact

Paul McMunn
Director of Public Works & Utilities
Phone: 613-283-4124 Ext. 1152
Email: pmcmunn@smithsfalls.ca

Project Overview

The Corporation of the Town of Smiths Falls is constructing a new Public Works Operations Centre to support the long-term operational needs of the municipality. Following significant fire damage to the existing Public Works Garage in February 2025, Councils previous direction to advance to design for a modern and functional replacement facility solidified this project as a priority for the Town. Capital funds were allocated for the construction of the facility during 2026 Capital budget deliberations.

The new Operations Centre will support Public Works services including roads, fleet maintenance, equipment storage, and winter maintenance activities. The facility will also house offices for Engineering and Public Works staff. The facility is intended to improve operational efficiency, workplace safety, and overall service delivery while providing adequate space for staff, equipment, and future growth.

The project includes the construction of a new operations building and associated site works designed to meet the Town’s current and long-term operational requirements.

Supporting Documents

None

Public Engagement

Residents with questions or comments regarding the project are encouraged to contact the Town using the information provided below.

Estimated Completion

Construction of the new Public Works Operations Centre is anticipated to be completed in Fall 2027.

Project timelines are subject to change based on construction progress, weather conditions, material availability, and other project related factors.

Project Contact

Paul McMunn
Director of Public Works & Utilities
Phone: 613-283-4124 Ext. 1152
Email: pmcmunn@smithsfalls.ca

Project Overview

The Town of Smiths Falls will be undertaking several road, sidewalk, curb, and asphalt rehabilitation projects throughout the community during the 2026 construction season. The projects identified in this notice are subject to available budget, tender results, and operational requirements. Accordingly, project scope, timing, and implementation may be revised, deferred, or cancelled as circumstances require.

Asphalt, Concrete, Milling and Paving Works (8 Locations)

The contract for the Asphalt, Concrete, Milling and Paving Works has been awarded to D Rock Paving Inc. Construction is scheduled to begin on August 4, 2026. Residents should expect temporary traffic impacts throughout the duration of the work. Advance notice of significant road closures or traffic disruptions will be provided where possible.

Percy Street (Pearl Street to Broadview Avenue)

Works will include full-depth asphalt replacement, grading and compaction to improve drainage, sidewalk and curb improvements, iron adjustments, and accessibility upgrades. New sidewalk depressions complete with Tactile Walking Surface Indicators (TWSIs) will be installed at Ross Street, Bell Avenue, Carol Crescent, and Marsha Drive. Isolated curb, driveway, and sidewalk repairs will also be completed. New speed humps will be installed as part of the project to assist with traffic calming and speed management.

Canal Street (Beckwith Street to Confederation Bridge)

Works will include full-depth asphalt reconstruction, curb and sidewalk installation, catch basin adjustments, accessibility upgrades, and street lighting improvements. The existing traffic island will be removed, and new lighting pole bases and conduit will be installed in preparation for new light standards captured under a different contract.

Aberdeen Avenue (Alfred Street to Davidson Street West)

Works will include curb replacement and associated driveway and roadway reinstatements.

Union Street (Cornelia Street East to Alexander Street – West Side)

New concrete sidewalk construction will be completed on the west side of Union Street, including connections to existing sidewalks. Accessible sidewalk ramps complete with Tactile Walking Surface Indicators (TWSIs) will be installed at Greig Street and Alexander Street. Isolated curb replacements will also be completed.

Ferrara Drive (Abbott Street to Lombard Street)

Works will include replacing existing asphalt sidewalks with new concrete sidewalk, addition of new concrete from Abbott Street to Ferguson Street, and accessibility improvements. New sidewalk depressions will be constructed with Tactile Walking Surface Indicators (TWSIs) at Abbott Street and Ferguson Street.

Old Mill Road (Adjacent to the Former Water Treatment Plant)

Works will include sidewalk reinstatement, grading and compaction, and asphalt roadway reinstatement.

Beckwith Street North (McGill Street to Montague Street)

Works will include pavement preparation, tack coat application, and asphalt overlay of the northbound and southbound traffic lanes.

James Street (Church Street to Gladstone Avenue)

Works will include full-depth asphalt removal, grading and compaction of the road base, and pavement reinstatement.

New Trunk Watermain and Sewer Separation - Phase 1

The contract for the New Trunk Watermain and Sewer Separation – Phase 1 project has been awarded to Ingimundson Construction Ltd. Construction is scheduled to begin on August 4, 2026. 

This project includes the construction of a new 400 mm trunk watermain connecting the elevated water storage tank located at 12 Air Care Drive to the existing watermain on Rideau Avenue, the construction of a new 200 mm distribution watermain to service properties on Lorne Street, the construction of a multi-use pathway connecting Air Care Drive to Lorne Street, the full reconstruction of Lorne Street, and sanitary sewer repairs on Rideau Avenue South between Parkland Court and Third Street.

Road closures, lane restrictions, and temporary service interruptions may be required throughout the duration of the project. Advance notice will be provided to affected residents and businesses where possible.

Canal Bridges Rehabilitation Project

The Town of Smiths Falls will be undertaking rehabilitation work on two bridge structures located along Beckwith Street between Jasper Avenue and Chambers Street: the New Lock Bridge over the Rideau Canal navigation channel and the Pedestrian Underpass Bridge located immediately to the south.

The project includes structural rehabilitation of both bridges, roadway milling and paving, intersection improvements at the Brockville Street, Jasper Avenue, Beckwith Street, and Lombard Street intersection, and upgrades to street lighting, electrical systems, and traffic signal infrastructure.

Due to the location of the work on a major arterial roadway, traffic impacts are expected throughout construction. Lane reductions, temporary traffic control measures, and delays should be anticipated. Access for emergency services, local businesses, and residents will be maintained throughout the project whenever possible.

Construction schedules and traffic management details will be communicated to the public as they become available.

Project Contact

We thank you for your patience as we complete these road improvements. Please expect delays and plan routes accordingly. Traffic updates will be available through Municipal 511.

Should you have questions or concerns relating to these construction projects, please contact the following staff:

Asphalt, Concrete, Milling and Paving Works
Tanner Green                                  
Engineering Technologist
Town of Smiths Falls
tgreen@smithsfalls.ca
613-283-4124 ext. 1120

Canal Bridges Rehabilitation Project
Paul McMunn
Director of Public Works & Utilities
Town of Smiths Falls
pmcmunn@smithsfalls.ca
613-283-4124 ext. 1152

Trunk Watermain and Sewer Separation – Phase 1
Paul McMunn
Director of Public Works & Utilities
Town of Smiths Falls
pmcmunn@smithsfalls.ca
613-283-4124 ext. 1152